Honda Factory — Infrastructure, Safety & LPG Station Installation Project

PROJECT DETAILS

Company: Honda

Project Name: Factory Infrastructure, Safety & LPG Station Installation

Project Type: Infrastructure

Project Year: 2015

Project Location: Kocaeli, Çayırova, Şekerpınar

PROJECT OVERVIEW

At the Honda Facilities site, comprehensive improvement and installation works were carried out supporting facility safety, infrastructure continuity, and operational efficiency. Emergency exit doors, wet areas, and floor applications were renewed, and site infrastructure was strengthened through drainage and road repairs. ADM LPG kit assembly facility and LPG filling station (civil + mechanical + electrical) installations and steel canopy fabrication and installation were completed, with all areas delivered ready for use.

SCOPE OF WORKS

  • Factory-wide emergency exit door replacement
  • Restroom renewals
  • PVC floor coating applications
  • Drain and grating renewals in various areas
  • ADM LPG kit assembly facility installation
  • LPG filling station installation (civil + mechanical + electrical)
  • LPG station steel canopy fabrication and installation
  • Facility-wide road repairs
  • Office renovations in various buildings