Bayer Factory — Facility Renovation & Infrastructure Modernization

PROJECT DETAILS

Company: Bayer

Project Name: Facility Renovation & Infrastructure Modernization

Project Type: Infrastructure

Project Year: 2015

Project Location: Kocaeli, Gebze

PROJECT OVERVIEW

At the Bayer Facilities site, comprehensive works were carried out supporting the renewal of production areas and the transition to a new layout within the SIP facility scope. Renovation, demolition, and new construction activities were executed with civil, mechanical, and electrical disciplines integrated. Steel platforms, anti-static epoxy coatings, plumbing, fire water infrastructure, and line inspections strengthened facility safety and operational continuity.

  • SCOPE OF WORKS
    • Production area renovation works
    • Steel platform fabrication
    • Anti-static epoxy floor coatings
    • General Management building plumbing works
    • SIP facility conversion: demolition of existing facility + civil, mechanical, electrical works per new layout
    • Fire water tank mechanical room construction works
    • HDPE piping works
    • Roof insulation works
    • Facility-wide infrastructure line inspection, cleaning, and camera survey